Product Description
PTFE is commonly refered to as “King of Plastic”. Among the corrosive materials, PTFE has unique and excellent property, it can melt alkali metals , element fluorine and aromatic hydrocarbon, besides, it can show random reaction in hydrochloric acid (different concentration),sulphuric acid, nitric acid, nitromuriatic acid, organic acid,trong oxidizer,alternation of concentrated and diluted acid, alternation of alkali and various organic solvent.

|
Inner Vessel
|
Jacket
|
|
|
Design Pressure(MPa)
|
0.4MPa
|
0.6MPa
|
|
Design Temperature(℃)
|
120℃
|
120℃
|
|
Operation Temperature(℃)
|
0-120℃
|
0-120℃
|
|
High-Tension Test
|
20KV
|
20KV
|





Broad Chemical Compatibility and High-Voltage Spark Insulation
Advanced thermoplastic lining technologies and mechanical drive assemblies yield key operational advantages:
-
Universal Chemical Defense: PTFE (“King of Plastics”) handles concentrated nitric acid, sulfuric acid, aqua regia, and alternating acid-alkali streams.
-
Superior Fluoropolymer Integrity: Undergoes high-tension spark testing at 20 kV to ensure a completely pinhole-free, non-porous lining layer.
-
Optimal Polymer Selection: Offers polyolefin (PO), polyethylene (PE), ETFE, or PTFE options to match specific thermal and chemical requirements.
-
Complete System Integration: Operates smoothly after installing matching drive motors, reducers, mechanical seals, sight glasses, and valves.
Core Technical Specifications and Equipment Parameters
Our factory-certified fluoropolymer-lined reactors adhere to strict international engineering limits:

Global Shipping, Secure Transit, and On-Site Installation
Exporting heavy chemical process reactors worldwide requires reinforced logistics and installation standards:
-
Protective Export Packaging: Technicians secure reactor components inside heavy-duty steel frames, plywood crates, and sealed boxes to avoid transit vibration damage.
-
Rapid Dispatch Timelines: Ships safely within 35 to 45 days following deposit confirmation across major ports like Qingdao, Shenzhen, and Shanghai.
-
Engineering and Demand Analysis: Furthermore, TangLian supplies complete technical demand analysis, customized drawings, and engineering offers free of charge.
-
Pre-Shipment Alignment: Installers fully assemble and debug all reactor units prior to factory dispatch to guarantee rapid site commissioning.




Our Service
1. User Demand Analysis

Premier Equipment Manufacturer in Northern China
Shandong Tanglian Heavy Industry Group Co., Ltd. is located in Hongshan Industry Park, Zichuan District, Zibo City, Shandong Province. Operating since 1998, the company stands as a premier chemical process equipment manufacturer in northern China.
TangLian operates four modern manufacturing plants covering 50,000 square meters with over 150 professional employees. Today, TangLian operates as an integrated industry and trade enterprise, providing engineering solutions across pharmaceutical, petroleum, biotech, pigment, and dye industries worldwide.
Certified Manufacturing and Global Compliance
TangLian holds Type I and Type II Pressure Vessel Design and Manufacturing Licenses, ISO9001 Quality Management System Certification, and SGS Testing Certificates.
The group fabricates comprehensive chemical equipment ranging from laboratory scale up to large industrial installations. Furthermore, TangLian manufactures matching agitators, reducers, mechanical seals, flush valves, and fluoropolymer-lined piping networks.



Frequently Asked Questions (FAQ)
Q1: What is your monthly factory supply ability for a PO PE ETFE PTFE lined reactor?
A1: Our factory maintains a manufacturing supply capacity of 30 complete sets per month for standard and customized lined reactors.
Q2: Where is your factory located?
A2: Our primary manufacturing facility is located in Hongshan Industry Park, Zichuan District, Zibo City, Shandong Province, China.
Q3: Do you charge extra fees for technical drawings and custom drafting?
A3: No, our engineering department provides technical drafting, customized drawings, and engineering offers completely free of charge.
Q4: How do you handle equipment installation and technical support after delivery?
A4: Before shipment, installers fully assemble and debug all equipment. After arrival, our technical department provides complete online support.










Reviews
There are no reviews yet.