Experienced Equipment Builder in Northern China
Shandong Tanglian Heavy Industry Group Co., Ltd. started building chemical units in 1998 in Zibo City, Shandong Province. Over the decades, our brand has grown into a major production hub for modern process machinery.
Furthermore, our team builds glass-lined kettles, stainless pressure tanks, clean GMP machines, wiped film evaporators,and plastic-lined equipment. Because our workshops use automated tools, every finished vessel holds uniform wall strength and reliable seals.
Official Licenses and Global Approvals
TangLian holds Type I and Type II Pressure Vessel Design and Manufacturing Licenses, ISO9001 System Approval, and SGS Quality Certificates.
In addition, our workers make vessels ranging from 50L pilot models up to 30,000L factory tanks. Customers also purchase matching drive units, mechanical shaft seals, bottom valves, and lined pipe accessories directly from us.
PRODUCT SPECIFICATIONS

|
Stainless steel condenser
|
|
|
Features of the water cooled condenser for steam:
1.Tubular exchanger is stainless steel or red copper, medium flowing cause strong disturbance to improve the heat transfer coefficient sharply.
2. Small size, light weight and low cost 3. Anti fouling and descaling The incrustant is difficult to generate for turbulent flow. Although there is some incrustant, it will be droped for the tube expansion. 4. Long life span, less maintenance 5. Saving energy 6. Less head loss 7. Convenient maintenance. |



Production details



PRODUCT CONFIGURATION

Explosion proof motor

Double layers( Impeller+paddle)agitator

Factory Workshop



Successful Project

Project in India

Project in Thailand

Project in Russia



Frequently Asked Questions (FAQ)
Q1: What is your factory supply capacity for an industrial stainless steel water cooled tube condenser for steam?
A1: Our factory manufactures approximately 1,500 complete sets per year for standard and customized projects.
Q2: What is your standard delivery timeline after placing an order?
A2: Usually, building and shipping takes 35 to 45 days once you approve final production drawings.
Q3: Do your engineers charge money for drafting custom layouts?
A3: No, our technical department draws custom plans and drafts price quotes free of charge.
Q4: How does your team assist with setup after the unit arrives?
A4: First, our installers assemble and test units before departure. Then, our staff provides direct online guidance during final setup.









Reviews
There are no reviews yet.