Product Description
|
Heat Exchange Area(㎡)Nominal value/Calculated value
|
Flow Speed(m³/hr)
|
||||||
|
Nominal Diameter(mm)
|
Tubes Quantity
|
Tubes Length(mm)
|
|||||
|
1500
|
2000
|
3000
|
4000
|
6000
|
|||
|
DN159
|
14
|
1.5/1.62
|
2/2.17
|
3/3.27
|
7.92/8.82
|
||
|
DN219
|
26
|
3/3.00
|
4/4.02
|
6/6.06
|
8/8.11
|
14.76/16.20
|
|
|
DN273
|
44
|
5/5.08
|
7/6.81
|
10/10.26
|
14/13.72
|
21/20.63
|
24.84/27.36
|
|
DN325
|
60
|
7/6.93
|
9/9.28
|
14/14.00
|
19/18.71
|
28/28.13
|
33.84/37.44
|
|
DN400
|
110
|
13/12.7
|
17/17.02
|
26/25.66
|
31/34.20
|
50/51.68
|
31.14/34.20
|
|
DN500
|
180
|
40/41.99
|
55/56.12
|
85/84.40
|
50.94/56.16
|
||
|
DN600
|
269
|
60/62.7
|
85/83.88
|
125/126.13
|
152.10/167.76
|
||
|
DN700
|
358
|
85/83.51
|
110/111.62
|
165/167.86
|
101.16/111.60
|
||
|
DN800
|
488
|
115/113.83
|
150/152.16
|
230/228.81
|
138.06/152.10
|
||
|
DN900
|
630
|
145/146.96
|
195/196.44
|
295/295.40
|
178.20/196.38
|
||
|
DN1000
|
792
|
185/184.75
|
245/246.95
|
370/371.36
|
223.92/246.96
|
||
Detailed Images
1.The structure is simple, the price is low, the bearing capacity is strong, and the thermal stress will not be generated.


Superior Enamel Integrity and Multi-Tube Heat Exchange
Engineered glass lining and strict manufacturing standards yield essential operational advantages:
-
Acid Vapor Defense: Delivers complete corrosion resistance against boiling hydrochloric, nitric, and sulfuric acid streams.
-
Zero Thermal Stress: Balances floating mechanical geometries so operating cycles generate no damaging thermal stresses.
-
Anti-Fouling Tube Bore: Features ultra-smooth glazed surfaces with low friction coefficients to eliminate internal pipe scaling.
-
High Flow Capacity: Accommodates high-volume cooling water circulation up to 246.96 m3/hracross diverse shell diameters.
Core Technical Specifications and Performance Limits
Our factory-certified enameled condensers adhere to strict international engineering limits:
Global Shipping, Secure Transit, and On-Site Installation
Exporting heavy industrial chemical equipment worldwide requires reinforced logistics standards:
-
Protective Export Packaging: Teams secure all primary components within heavy-duty steel frames, custom plywood crates, and sealed boxes to prevent transport vibration damage.
-
Simplified Unloading: Steel framing and balanced lifting points allow rapid crane or forklift offloading at customer job sites.
-
Pre-Shipment Inspection: Installers inspect, align, and debug all components before factory dispatch to guarantee seamless startup.
-
Proven Global Deployment: TangLian successfully operates piping systems across large-scale industrial projects in Thailand, India, Russia, and over 37 countries globally.




After Sales Service

Premier Equipment Manufacturer in Northern China
Zibo Tanglian Chemical Equipment Co., Ltd. was founded in 1998 in Zibo City, Shandong Province. The company stands as an industry-leading manufacturer of chemical process equipment.
The group specializes in AE, BE, and CE glass-lined reactors, SS304/SS316L stainless steel pressure vessels, GMP-compliant sanitary units, wiped film evaporators, and fluoropolymer-lined equipment. By operating automated manufacturing workshops, TangLian ensures uniform fabrication precision and structural pressure stability.
Certified Manufacturing and Global Compliance
TangLian holds Type I and Type II Pressure Vessel Design and Manufacturing Licenses, ISO9001 Quality Management System Certification, and SGS Inspection Certificates.
The group fabricates comprehensive chemical systems ranging from 5L laboratory scale up to 50,000L industrial installations. Furthermore, TangLian manufactures matching drive assemblies, mechanical seals, flush valves, and fluoropolymer-lined piping networks.



Frequently Asked Questions (FAQ)
Q1: What is your annual factory supply capacity for a Glass lined pipe type condenser?
A1: Our factory maintains a manufacturing supply capacity of approximately 1,500 complete sets per year for standard and customized condenser units.
Q2: What is your standard manufacturing delivery timeline?
A2: Generally, standard fabrication and delivery require 35 to 45 days after receiving deposit confirmation and approving technical drawings.
Q3: Do you charge extra fees for technical drawings and custom drafting?
A3: No, our engineering department provides technical drafting, customized drawings, and engineering offers completely free of charge.
Q4: How do you handle equipment installation and technical support after delivery?
A4: Before shipment, installers fully assemble and debug all equipment. After arrival, our technical department provides complete online support.










Reviews
There are no reviews yet.